Full remodels
- Gut renovation and layout redesign
- Non-structural wall removal and openings
- New flooring, skirting and ceiling patching
- Appliance relocation, plumbing and drainage moves

Home/Kitchens
Gut renovations, layout changes, custom cabinetry and stone worktops. We start with the way you move around the room and design outward from there.
3–4 weeks
Typical build time
60–90 min
Free measure, at your home
2 rounds
Design revisions included
5 years
Craftsmanship warranty

Kitchens
Most kitchens in UAE villas and apartments were laid out by a developer who never cooked in them. The fridge opens into the walkway, the bin is nowhere near the prep area, and half the corner cabinet is unreachable dead space.
We fix the layout first. Once the work triangle, the storage zones and the circulation make sense, choosing finishes is the easy part.
Scope
If it isn't on this list, ask — the answer is usually yes, and if it isn't we will say so plainly.
Recent work

Full remodel · 5 weeks
Arabian Ranches, Dubai — Wall removed, 3.2 m island added, quartz worktop with waterfall ends.

Full remodel · 4 weeks
Dubai Marina — Apartment galley reworked with full-height pantry and integrated appliances.

Full remodel · 6 weeks
Al Furjan, Dubai — Structural opening into the living room, breakfast bar seating for four.
No projects in that category yet — try another filter.
Questions
Something not covered here? WhatsApp us on +971 56 464 0625 and ask — a real person replies.
It depends on size, materials and how much moves. A cabinet refacing project sits at the bottom of the range; a full remodel with stone worktops and appliance changes sits at the top. We give you an itemised fixed quote after the measuring visit — before that, any number would be a guess, and guesses are how projects go wrong.
Almost always, yes. We seal the work zone with zip walls, run HEPA extraction, and leave the site clean each evening. For a full kitchen remodel we'll help you set up a temporary kitchen — kettle, microwave, fridge — somewhere else in the home.
It doesn't. The quote is fixed at sign-off. The only thing that changes the number is you asking for something different — a finish upgrade, an extra unit. Anything we should have spotted at survey stage is on us.
Yes. Under-cabinet lighting, pendant points, pot fillers, smart switches, sink and appliance connections are all part of the scope. Where a project needs a licensed third-party sign-off, we arrange it and it's in the quote.
Free consultation
Book a 30-minute consultation. We measure, we listen, we leave you with a written brief. No deposit and no pressure.